SNWay Leave Case No.Proposal ParticularsOrganization NameChainageCPM OfficeReceived DateStatusRemarks (If Any)
97 MAHSR/WL/2024/121Way Leave Permission to laying 90 mm dia. PE pipeline network for Rata to Paria connectivity Taluka VapiGujarat Gas Limited179+070CPM Surat08-05-2024 Closed
Duplicate Entry made wrongly by Applicant. Original Entry is MAHSR/WL/2024/121
98 MAHSR/WL/2024/2982Invalid EntryInvalid EntryInvalid EntryCPM Surat27-06-2024 Closed
Case doesn’t pertain to NOC and entry has been made wrongly.
99 MAHSR/WL/2024/2983Way Leave Permission for road between 2 pillars at MAHSR Chainage 26.728 -26.745 km. Length: 17.12 m, Width:17.95 m. Area - 310 sq.mt, Thane.Goverdhan Kalu Patil26+728CPM Mumbai28-06-2024 Closed
Despite various reminders & telephonic communications, applicant didn’t respond and application is closed.
100 MAHSR/WL/2024/2984Way Leave Permission for road between 2 pillars at MAHSR Chainage 26.728 -26.745 km. Length: 17.12 m, Width:17.95 m. Area - 310 sq.mt, Thane.Goverdhan Kalu Patil26+728CPM Mumbai28-06-2024 Closed
Despite various reminders & telephonic communications, applicant didn’t respond and application is closed.
101 MAHSR/WL/2024/2999Way Leave Permission for crossing of 300 mm diameter Water pipeline along the NHSRCL Corridor in Pathri village Dist : Navsari for drinking water supply.Gujarat Water Supply & Sewerage Board (GWSSB)226+55CPM Surat03-09-2024 Closed
Duplicate Entry made wrongly by Applicant. Original Entry is MAHSR/WL/2022/30
102 MAHSR/WL/2025/A-20Way Leave Permission for crossing MAHSR track at chainage 123+200 against construction of 132kv Dahanu Jawhar Tr lineMSETCL123+193CPM Palghar12-07-2025 Closed
Entry made wrongly under NOC. Original Entry is MAHSR/WL/2025/A-19