| SN | Way Leave Case No. | Proposal Particulars | Organization Name | Chainage | CPM Office | Received Date | Status | Remarks (If Any) |
|
97
| MAHSR/WL/2024/121 | Way Leave Permission to laying 90 mm dia. PE pipeline network for Rata to Paria connectivity Taluka Vapi | Gujarat Gas Limited | 179+070 | CPM Surat | 08-05-2024 |
Closed
|
|
|
98
| MAHSR/WL/2024/2982 | Invalid Entry | Invalid Entry | Invalid Entry | CPM Surat | 27-06-2024 |
Closed
|
|
|
99
| MAHSR/WL/2024/2983 | Way Leave Permission for road between 2 pillars at MAHSR Chainage 26.728 -26.745 km. Length: 17.12 m, Width:17.95 m. Area - 310 sq.mt, Thane. | Goverdhan Kalu Patil | 26+728 | CPM Mumbai | 28-06-2024 |
Closed
|
|
|
100
| MAHSR/WL/2024/2984 | Way Leave Permission for road between 2 pillars at MAHSR Chainage 26.728 -26.745 km. Length: 17.12 m, Width:17.95 m. Area - 310 sq.mt, Thane. | Goverdhan Kalu Patil | 26+728 | CPM Mumbai | 28-06-2024 |
Closed
|
|
|
101
| MAHSR/WL/2024/2999 | Way Leave Permission for crossing of 300 mm diameter Water pipeline along the NHSRCL Corridor in Pathri village Dist : Navsari for drinking water supply. | Gujarat Water Supply & Sewerage Board (GWSSB) | 226+55 | CPM Surat | 03-09-2024 |
Closed
|
|
|
102
| MAHSR/WL/2025/A-20 | Way Leave Permission for crossing MAHSR track at chainage 123+200 against construction of 132kv Dahanu Jawhar Tr line | MSETCL | 123+193 | CPM Palghar | 12-07-2025 |
Closed
|
|