Status of Way Leave Application
Page
SNWay Leave Case No.Proposal ParticularsOrganization NameChainageCPM OfficeReceived DateStatusRemarks (If Any)
49 MAHSR/WL/2024/2996Way Leave Permission for laying of 125 mm dia. PE pipeline for crossing of NHRCL Ahmedabad-Mumbai Crossing Overhead Railway Line between Pillar No. 445/P-08 & 09 for Uttarsanda to Bhumel, PNG Pipeline project Taluka Nadiad, Dist.: KhedaGujarat Gas Limited445+331CPM Vadodara28-08-2024 Approved
Way Leave Approval Conveyed to Applicant on 15.05.2025
50 MAHSR/WL/2024/3002Way Leave Permission for crossing of 300 mm diameter horizontal borehole for water main pipeline including 250 mm dia M.S.Casing pipe for Water pipeline along the NHSRCL Corridor in Vadsangal village Dist : NavsariGujarat Water Supply & Sewerage Board (GWSSB)222+650CPM Surat03-09-2024 Approved
Way Leave Approval Conveyed to CPM Office on 06.12.2024
51 MAHSR/WL/2024/3005Way Leave Permission for crossing of 300 mm diameter horizontal borehole for water main pipeline including 250 mm dia M.S.Casing pipe for Water pipeline along the NHSRCL Corridor in Deshad village Dist : NavsariGujarat Water Supply & Sewerage Board (GWSSB)220+780CPM Surat03-09-2024 Approved
Way Leave Approval Conveyed to CPM Office on 06.12.2024
52 MAHSR/WL/2024/3006Way Leave Permission for crossing of 300 mm diameter horizontal borehole for water main pipeline including 250 mm dia M.S.Casing pipe for Water pipeline along the NHSRCL Corridor in Pati village Dist : NavsariGujarat Water Supply & Sewerage Board (GWSSB)220+035CPM Surat03-09-2024 Approved
Way Leave Approval Conveyed to CPM Office on 06.12.2024
53 MAHSR/WL/2024/3007Way Leave Permission for crossing of 300 mm diameter horizontal borehole for water main pipeline including 250 mm dia M.S.Casing pipe for Water pipeline along the NHSRCL Corridor in Ghetki village Dist : NavsariGujarat Water Supply & Sewerage Board (GWSSB)215+750CPM Surat03-09-2024 Approved
Way Leave Approval Conveyed to CPM Office on 06.12.2024
54 MAHSR/WL/2024/3012Way Leave Permission in favour RLDA for Relocation/Shifting and re-routing of LT Power supply cables and panels for Sub Station 1096 from PF 7 8 & 9 to PF 4 & 5 from feeding Sub Station supply point 1096 near HSR Chainage 499.600 toRail Land Development Authority499+600CPM Ahmedabad04-09-2024 Approved
Technical Clearance conveyed to CPM Office on 01.10.2024