46
| MAHSR/WL/2024/2994 | Way Leave Permission for laying of 02 hume pipe of 600 mm dia water pipe line across MAHSR at Ch.169+300 in Village Karvad Taluka Vapi & Distt. Valsad | PlastIndia International University | 169+300 | CPM Surat | 28-08-2024 |
Approved
|
|
|
47
| MAHSR/WL/2024/2993 | Way Leave Permission for 400KV D/C Magarwada-Kala Transmission Line overhead crossing over NHSRCL corridor, alignment at 155.400 of Village UPLAT, Palghar | Powergrid | 155+400 | CPM Palghar | 22-08-2024 |
Approved
|
|
|
48
| MAHSR/WL/2024/2995 | Way Leave Permission for laying of 03 hume pipe of 900 mm dia water pipe line across MAHSR at Ch.169+500 in Village Karvad Taluka Vapi & Distt. Valsad. | PlastIndia International University | 169+500 | CPM Surat | 28-08-2024 |
Approved
|
|
|
49
| MAHSR/WL/2024/2996 | Way Leave Permission for laying of 125 mm dia. PE pipeline for crossing of NHRCL Ahmedabad-Mumbai Crossing Overhead Railway Line between Pillar No. 445/P-08 & 09 for Uttarsanda to Bhumel, PNG Pipeline project Taluka Nadiad, Dist.: Kheda | Gujarat Gas Limited | 445+331 | CPM Vadodara | 28-08-2024 |
Approved
|
|
|
50
| MAHSR/WL/2024/3002 | Way Leave Permission for crossing of 300 mm diameter horizontal borehole for water main pipeline including 250 mm dia M.S.Casing pipe for Water pipeline along the NHSRCL Corridor in Vadsangal village Dist : Navsari | Gujarat Water Supply & Sewerage Board (GWSSB) | 222+650 | CPM Surat | 03-09-2024 |
Approved
|
|