Status of Way Leave Application
Page
SNWay Leave Case No.Proposal ParticularsOrganization NameChainageCPM OfficeReceived DateStatusRemarks (If Any)
73 MAHSR/WL/2025/A-34Construction of proposed North Ramp of elevated road towards Saraspur side between HSR pier 500 P10 and P11RLDA500+416CPM Ahmedabad21-07-2025 Approved
NOC was conveyed to CPM Office on 30.04.2025
74 MAHSR/WL/2025/A-35Construction of proposed North Tunnel towards Saraspur side between HSR Pier 500 P10 and 500 P11RLDA500+467CPM Ahmedabad21-07-2025 Approved
NOC was conveyed to CPM Office on 30.04.2025
75 MAHSR/WL/2025/A-37Construction of proposed South Tunnel towards Saraspur side near Ahmedabad HSR StationRLDA499+800CPM Ahmedabad22-07-2025 Approved
NOC was conveyed to CPM Office on 30.04.2025
76 MAHSR/WL/2025/A-38Construction of Extension of New South FOB from PF 8/9 to 10/11 between HSR pier at ADI station grid X8 and X9RLDA499+800CPM Ahmedabad22-07-2025 Approved
NOC was conveyed to CPM Office on 02.05.2025
77 MAHSR/WL/2025/A-39Construction of Saraspur ROB between HSR pier 499 P10 and P11RLDA499+450CPM Ahmedabad22-07-2025 Approved
NOC was conveyed to CPM Office on 02.05.2025
78 MAHSR/WL/2025/A-48Way Leave Permission for laying of 66 kV underground cable line with 630 Sq.mm XLPE Power cable (6+1) from 66 KV Velanja SS to 66 KV Pipodara 2 SS crossing at MAHSR at Ch 279+870 village Galudi Taluka Abrama, Distt Surat.GETCO279+870CPM Surat13-08-2025 Approved
NOC was conveyed to Applicant on 15.04.2026